Structural Collapse











           1    What is the name of           2    What are its specific objectives related to the Priority Unwanted
                the critical control for
                                                   Event (PUE)?
                Structural Collapse?
          Exclusion Zones                    Access to structures that are at-risk of collapse is restricted / prevented

           3    What are the critical         4    What are the activities       5    What can be sampled from
                control performance
                                                   within the management
                                                                                      the set of activities for
                requirements to meet the           systems that support               verification, providing a
                objectives?                        having the critical control        clear image of the critical
                                                   able to do what is required?       control status?
          At-risk structures/areas are identified and   Annual structural integrity inspection   Annual inspection and assessment
          marked as exclusion zones          and assessment process             records
                                             Demolition program                 Field observation to validate

          Access to areas where there is risk of   Exclusion zones are monitored to   Exclusion zone monitoring records
          collapsing structures is physically blocked  maintain access restriction


           6    What is the target performance for critical     7    What is the critical control performance
                                                                     trigger for shutdown, critical control review or
                control?
                                                                     investigation?
          Personnel cannot access areas/structures at risk of collapse  Lack of physical barriers or unauthorized entry to exclusion
                                                               zones











































          Creation date: 01/2021 • The latest and only controlled version of this document is available on the HSE intranet.