Page 4 - TRD
P. 4

line crossings and 33kV Power  Target                       4
                    line crossings with less         33 KV                 33
                 clearances to UG crossing
                                                                                                5(Horizontal
                                                                                       1        boring done
                                                                                               in 04 locations
                                                     Target                6
                                                                                                   and UG
                                                                                                cabling work
                                                                                               is about start)
               Out sourcing of PSI activities -      TSS-20,SP-
          4    No. of TSS regions with               18,SSP-55, AT-                    0
               population of SPs/SPs/AT's etc.  570
               Replacement of OHE masts
               with less contact wire height
          5    due to raising of track (due to                             3           0
               top attachment of CL
               reaching max. limit)
               6 Elimination of masts with
               implantation less than 2.50m                                                    Tender under
          6    on main line in BZA-BPQ KZJ-                               549          0           process
               SC sections, for facilitating
               train speed of 130kmph
        Action plan items for the year 2020-21:

          Sl.
         No.                 Item in brief                Target      Total             Remarks
                Provision of earthing station at
           1    SSP/SP with buried rail as per              66          0      Earth pits ready and
                RDSO SMI TI/SMI/0032                                           Bonding under progress
                Isolators: Replacement with
                correct connector or jumper
           2                                                 0         20                 JMKT
                wherever mismatch of terminal
                connector Jumper is observed
                Provision of Isolation facility to
           3    sidings with CB/BM wherever                  0          0
                needed
                Provision of out rigger
           4    arrangement at isolators (Spl                0          2
                Drive: 3)
                Provision of PTFE at all TSS
           5                                                 0          0
                locations
                Erection of Model OHE at each
           6                                                 0          0
                depot
                Requirement of Thermo vision
           7    cameras for each OHE & PSI                  16          0      Further under purchase
                Depot                                                          progress
                Anti-falling devices for ATD to
           8    cover failure of Clevis, SS rope             0          0
                and etc.
                Provision of Anchor Double straps
           9    between ATD 9-Ton insulator and              0          7
                compensating plate