III.   RETROFITMENT OF HOTEL LOAD CONVERTER:
           Conversion of EOG trains to HOG system is a mission item of Railway Board
           and Dash board item of Hon’ble MR in the wake of huge financial saving in
           terms  of  Diesel  fuel  besides  reduction  in  noise  and  air  pollution.  To
           accomplish  this  mission  WAP7  locos  are  being  retrofitted  with  Hotel  Load
           Converters  to  cope  for  the  demand  of  HOG  compatible  trains.  Till  now
           thirteen  locomotives  have  been  retrofitted  with  Hotel  Load  Converters
           against the target of 11 locomotives.



               IV.    REPLACEMENT OF TBU/PBU WITH CONVENTIONAL BRAKE RIGGING IN
                      WAG-9 LOCOS.
           RDSO issued instructions for Conversion of brake rigging of WAG9/9H locos
           with  TBU/PBU  type  brake  rigging  to  conventional  brake  rigging.  Sixteen
           locomotives  are  converted  to  conventional  brake  rigging  during  this  year
           and  till  date  total  42  locomotives  are  replaced  with  conventional  brake

           rigging.

                V.    PROBLEM OF BP NOT DROPPING THROUGH DBC (A9) IN E70 BRAKE
                      SYSTEM
           1.  ELS/LGD has highlighted the non-availability of “fail safe system” feature
           in  E-70 brake system during the failure of control reservoir pressure

           transducer output due to opening or grounding to earth leading to brakes
           not applying due to non-dropping of BP through A9 and also identified the
           additional scenario of loss of CAB activation signal (2111A or 2111B signal) to
           E-70 brake system also causes the same behaviour. During 2020-21, ELS/LGD
           has conducted extensive study and all such scenarios along with possible
           long term and short term measures have been advised to firm and during
           December 2020, firm has incorporated all the solutions and developed the
           Modified SOAEB system to overcome the identified issues. Persistent

           correspondence and deliberations with firm has given fruitful results. Based
           on the ELS/LGD efforts and joint exercise conducted with FTRTIL, RDSO has
           issued final guidelines to provide modified SOAEB (System Operated
           Automatic Emergency Braking) vide lr. No: EL/3.2.19/3-Phase, dt: 28.10.2021
           in all the locomotives equipped with E-70 brake panels free of cost on PAN
           INDIA basis (approx. 2000 locomotives).  In addition to enhancing safety of

           E-70 brake system, the efforts of ELS/LGD has resulted in savings of Rs.20
           crores to IR as earlier firm was insisting to procure SOAEB and now firm has
           agreed to provide the modified SOAEB in all locomotives on free of cost
           basis.