1.3.3.  BRIDGE STRENGTHENING WORKS
                   Division  is  in  forefront  in  strengthening  of  bridges.  Works  such  as  apoxy
                   grouting done at exposed reinforcement, de-silting of water ways, provision
                   of flooring to bridges, construction of ballast retainers on the approach of
                   bridges  strengthening  of  wing  walls,  replacement  of  corroded  re-railing
                   ramp plates, and replacement of corroded rivet heads and water login got

                   RUBs etc have been done during the year.














                                  DRAINAGE PROBLEM CLEARED AT LC No 62 BEFORE AND AFTER
















                                 DRAINAGE PROBLEM CLEARED AT LC No 86 BEFORE AND AFTER
















                       BRIDGE No 150 DN IN KZJ-BPQ SECTION        BRIDGE No 150 DN IN KZJ-BPQ SECTION

                                  BEFORE REPAIR                              AFTER REPAIR