1.3.3. BRIDGE STRENGTHENING WORKS
Division is in forefront in strengthening of bridges. Works such as apoxy
grouting done at exposed reinforcement, de-silting of water ways, provision
of flooring to bridges, construction of ballast retainers on the approach of
bridges strengthening of wing walls, replacement of corroded re-railing
ramp plates, and replacement of corroded rivet heads and water login got
RUBs etc have been done during the year.
DRAINAGE PROBLEM CLEARED AT LC No 62 BEFORE AND AFTER
DRAINAGE PROBLEM CLEARED AT LC No 86 BEFORE AND AFTER
BRIDGE No 150 DN IN KZJ-BPQ SECTION BRIDGE No 150 DN IN KZJ-BPQ SECTION
BEFORE REPAIR AFTER REPAIR