1.4.  SAFETY

               Special  emphasis  has  been  laid  on  safety  in  the  division.  The  following
               measures are being taken


               1.4.1.  SAFETY DRIVES (upto Oct’ 2021)


                                                                                   No of
                  S.No        Safety drive issued by            Frequency                     Remarks
                                                                                   drives
                    1     CTE special drive                  Once in a month         1        Attended
                          Night    surprise   foot   plate
                    2                                        Once in a month         10       Attended
                          inspection
                          Safety drive as per Rly  Board
                    3                                       15 days drive only       8        Attended
                          order
                          Special  drive  on  Bridges
                          includes  FOBs  /  ROBs  as  per
                    4     Railway       Board        letter   Quarterly safety       1       Completed
                                                                   drive
                          2016/52/CE/III/BR/Safety
                          Dt:09.07.18.



               1.4.2.  INTENSIVE INSPECTIONS



                 Counselling  of  Group  „C‟  and  „D‟  staff  has  been  done  to  increase
                   awareness  for  safe  working,  duly  deputing  Mobile  Trainers  to  the  field
                   staff at site and imparting training.
                 Subways  are  being  constructed  at  feasible  locations  to  eliminate  the
                   menace of LC gates.
                 Pamphlets on “safety precautions to be observed by road users” were
                   distributed during major festivals and also to road users at various Level
                   crossings.
                 Night  surprise  inspection  by  officers  is  being  done  every  month  in
                   addition to checking of patrolmen as per the schedule.
                 Inspections at officers‟ and supervisors‟ level have been intensified, duly
                   drawing advance programmes.
                 Cash award is being given for Night patrolman and
                 Keymen who detect Rail/Weld failures during their duties.

            1.5. STAFF TRAINING

               In  order  to  improve  /  refresh  the  knowledge  of  grass  root  level  workers  on
               track  i.e.  trackmen,  gatemen,  key  men  and  mates,  Secunderabad  division
               has taken the following steps: