Page 6 - Electrical (M)
P. 6
c). ACTION PLAN ITEMS (POWER)
Actual 2019- Actual Actual
Target
Description 20 2020-21 2021-22
2021-22
(Apr-Oct) (Apr-Oct) (Apr-Oct)
1 Energy consumption in MU 15.08 12.04 13.24
(w.r.t Last year) (-5%) 26.30 (Apr-Sep) (Apr-Sep) (Apr-Sep)
2 Provision of sanctioned Escalators 4 0 0 2
3 Provision of sanctioned Lifts 11 5 0 2
4 Energy auditing of major load 2 7 0 1
centres and pumping installations
5 Green Co. rating for office/station
buildings (ensure electrical 1 - 0 1
compliance)
6 Use of solar panels for manned LC
gates 5 2 2 0
7 New/Replacement of
conventional geysers by solar
geysers and repair/reconditioning 3 3 1 3
of existing solar geysers
8 Solar Based Street lights for a)
Colonies b) Training Institutes 18 12 0 0
9 Efficient measurement of
pumping installations and 1 2 0 0
implementation of action plan
10 Energy efficient pumps in place of
old in-efficient pumps 10 11 8 7
11 Automation of pumps 1 Nil 0 1
12 Bifurcation of fans in 2/3 circuits at
stations to ensure switching off 10 12 0 4
fans in non seated areas during
non-train hours
13 Provision of timers for lighting and 20 33 0 20
fan circuits
14 Use of occupancy sensors for light
control in a) Officers chambers b) 50 102 0 8
Conference rooms c) Waiting
Halls.
15 Reassessing the CMD 3 - 0 1
16 Provision of prepaid meters for out 100% 100% 100% 100%
siders