Page 27 - HSE -Zero is Possible_v1.0
P. 27

Fort-de-France Grinding Station
       Waste

       Recycling gypsum from

       demolitions                                                                                        FRENCH  W. INDIES  Cement



       Opportunity            Results
       To utilize construction   •  Estimated 10%    Construction plasterboard waste
       demolition waste as a   replacement of natural
       source for gypsum into   gypsum by 2023
       cement production,     •  Target of 30%
       therefore reducing use of   replacement by 2025
       natural resources.

       Solution
       Recover plasterboard /
       drywall waste in order to                                                                       Arnaud Guilloré
       reduce the use of natural                                                                           CEO
       gypsum.








                                                     Gypsum blending with plasterboards                 Leslie Carles
                                                                                                       Head of Industrial
                                                                                                        Performance &
                                                                                                        Environment






                                                                                                                    21
   22   23   24   25   26   27   28   29   30   31   32