Page 23 - HSE -Zero is Possible_v1.0
P. 23

Irbid RMX Plant
       Waste

       Cooperation with

       customers on ZERO waste                                                                              JORDAN  Ready-mix

       (with ZERO investment)


       Opportunity            Results
       To give a useful       •  Zero CAPEX project
       destination to internally   •  705 tonnes / year
       generated concrete      recycled
       sludges, avoiding      •   Opportunity to replicate
       their disposal into     this practice in the other
       landfills. Cooperation   plants
       with customers toward
       circularity.                                                                                    Samaan Samaan
                                                                                                           CEO
       Solution
       To use solid waste from
       concrete operations
       (sludges) in construction
       works and avoid
       landfilling. Such waste is
       recycled as filling material
       (e.g., concrete basements
       instead of soil and                                                                               Raed Musa
       aggregate).                                                                                        Head of
                                                                                                        Environment &
                                                                                                          Geocycle






                                                                                                                    17
   18   19   20   21   22   23   24   25   26   27   28