MBeya Cement Plant
TANZANIA Cement Good maintenance
Energy
saves money
Opportunity
• Idle running of raw mill
To reduce power Results
consumption at the fan has reduced to
raw mill optimizing Gas 0 hour as of May 2023
Conditioning Tower (GCT) • Improved efficiency of
operations. the Gas Conditioning
Tower
Solution • Expected annual savings
• Inspection of water o Power: 150 MWh
network and removal of o Costs: 8 kCHF
Ahmed Mhada accumulated mud
Acting CEO
• Structural integrity
inspection of the
conditioning tower
• Reinstallation of 4
complete water spray
systems (lances, flexible
pipes and nozzle)
Alex Kasengo
Head of HSE