Page 18 - HSE -Zero is Possible_v1.0
P. 18

MBeya Cement Plant
           TANZANIA  Cement  Good maintenance
                           Energy




                           saves money



                           Opportunity
                                                   •  Idle running of raw mill
                           To reduce power         Results
                           consumption at the       fan has reduced to
                           raw mill optimizing Gas   0 hour as of May 2023
                           Conditioning Tower (GCT)   •  Improved efficiency of
                           operations.              the Gas Conditioning
                                                    Tower
                           Solution                •  Expected annual savings
                           •  Inspection of water   o Power: 150 MWh
                            network and removal of   o Costs: 8 kCHF
       Ahmed Mhada          accumulated mud
        Acting CEO
                           •  Structural integrity
                            inspection of the
                            conditioning tower
                           •  Reinstallation of 4
                            complete water spray
                            systems (lances, flexible
                            pipes and nozzle)


       Alex Kasengo
       Head of HSE