Ashaka Cement Plant
       Energy

       Updates to the main

       transformer                                                                                          NIGERIA  Cement



       Opportunity            Results
       To minimize the usage of   •  Improved reliability and
       diesel generators, which   quality of power supply
       were used due to the    from the grid
       low reliability of the main   •   90% of power supplied
       transformer.            by the grid
                              •  Total savings of 757 kCHF
       Solution               •   Estimated emission
       •  Upgrade of the 15 MVA   reduction is 260 tCO2/
        transformer, improving   year                                                                 Lolu Alade-Akinyemi
        the protection of the                                                                               CEO
        plant equipment
       •  Partnership established
        with the grid operator on
        preventive maintenance
        schedules and general
        grid operation
       Optimization discovered
       through the HSE power
       program.                                                                                       Rachael Ezembakwe