Mombasa Cement Plant
                           Energy

                           Enlightened by the sun, a
           KENYA  Cement   zero Scope 2 CO  quarry

                                                       2


                           Opportunity
                                                   •  Energy cost savings
                           To eliminate the use of   Results
                           non decarbonized grid   •  Improved lighting in
                           electricity at the quarry.  remote areas
                                                   •  Payback period of about
                           Solution                 15-18 months
                           •  Solar-powered lighting
                            at the quarry
                           •  Six lamps installed in key
                            areas
       Mohit Kapoor        •  Total of 20 lamps will be
          CEO               installed to cover a total
                            area of 1,200 m
                                        2
                           •  Total cost of installation:
                            CHF 4,900





      Lawrence Maiteri
       Head of HSE