Page 16 - Zero is Possible - Volume 3
P. 16

Mannersdorf
                         Energy
           AUSTRIA  Cement  Opportunity          Results
                         CO2 neutral locomotive




                         Replace an obsolete
                                                 •  4.2 tonnes of CO2 saved
                         diesel locomotive by a
                                                  per year
                         carbon-neutral internal
                                                  costs savings per year
                         rail shunting solution.  •  9 kCHF maintenance
                                                 •  4.8 kCHF diesel savings
                         Solution                 per year
                         Switched to an electric   •  Battery charging takes
                         yard locomotive charged   place during the day at
                         by our own solar panels.   0 cost
                         Cost: 400 kCHF
                         (4.9 kCHF per month lease)
       Haimo Primas
          CEO









     Dejan Damljanovic
       Head of HSE








    14
   11   12   13   14   15   16   17   18   19   20   21