Bazian
                         Energy

                         From airlift to bucket

           IRAQ  Cement  elevator                •  Ensures more reliable


                         Opportunity
                         With continuous increases
                                                  operation
                         in electricity costs and   and continuous kiln
                         growing environmental   Cost: 2.4 MCHF
                         concerns, the Iraq team   Timeline: 1.8 years
                         aimed to optimize plant
                         operations by adopting a
                         more energy-efficient and   Results
                         reliable system that also   •  Power consumption
                         reduces environmental    savings of 750 kCHF/year
                         impact.                 •  Thermal consumption
       Medhat Ismail                              savings of 150 kCHF/year
         Darwish         Solution                •  Maintenance spend
          CEO                                     savings of 100 kCHF/year
                         The airlifts at the Raw Mill   •  CO2 emissions reduction
                         and Kiln were replaced
                                                  5,000 tons/year
                         with bucket elevators   •  Payback period: 2.3 years
                         to reduce energy use,
                         lower noise, and avoid
                         production stoppages.
                         •  Bucket elevators consume
                          less power (–3.0 kWh/t ck)
      Amanje Rasheed      and emit less noise
       Head of H&S
                         •  Airlifts retained as backup
                          to avoid kiln stoppages in
                          case of failure