Page 15 - Zero is Possible - Volume 2
P. 15
Rudinata AGG Plant
Energy
Green energy for all
administrative buildings on site BULGARIA Aggregates
Opportunity Results
Reduction of Scope 2 emissions Typically, the administrative
from purchased electricity buildings are fully powered
consumed in our sites. by green energy, meeting
100% of their daily electricity
Solution requirements. The CO₂
Installation of a 10 kW reduction calculated by
photovoltaic system to cover the app surpassed initial
all electricity needs of the expectations by 23%, with
administrative buildings. 3.26 tCO₂ saved compared to
• The project was implemented the planned 2.65 tCO₂ over a Rossen Papazov
as part of HSE-IP and became 120-day period. Additionally, CEO
operational on December 1 , the system ensures
st
2023. uninterrupted customer
• The installation supplies two service during power outages
buildings where dispatch, from the external supplier.
offices and welfare facilities
are located.
• A mobile app from SolaX
Power was connected to
the PV installation in March Desislava Kirova
2024, allowing for real-time Head of
monitoring of its status. Environment
11