CAMEROON Cement Figuil Cement Plant
Energy
From diesel to grid
Opportunity
• Secured a reliable and
The quarry’s dependence Results
on diesel generators, cost-effective electricity
driven by no connection supply for quarry
to the grid, resulted in operations
high costs and significant • Achieved 100% grid-
environmental impact. powered operation
for the new Hazemag
Solution crusher
• Installed two 630 kVA • Reduced the specific
Xavier Legrand electricity use in the
CEO transformers to connect
the quarry to the grid Hazemag crusher vs
• Established a Dragon Crusher by 75%
partnership with in 2024 from 3.45 to
ENEO (national energy 0.81 kWh/tonne
provider) for ongoing
maintenance and grid
management
Total investment:
Emmanuel Bayong
Head of HSE 244 kCHF