Page 9 - Zero is Possible - Volume 2
P. 9

Chekka Logistics Yard
       Energy

       The sun is in the roof                                                                               LEBANON





       Opportunity            Results                                                                           Cement
       The logistics yard currently   •  Fully operational in
       uses electricity generated   2024, producing
       only by its own power plant.   11 MWh of renewable
       This solar project aims   energy in 3 months,
       to cut down on energy   saving 7 tCO2 and
       use from non-renewable   3 tonnes of heavy
       sources and reduce the use   fuel oil
       of fossil fuels.
       Solution                                                                                        Jamil Bouharoun
       A solar power system, with                                                                          CEO
       a total capacity of 30 kVA,
       is made up of 64 solar
       panels:
       •  Installed in the logistics
        yard
       •  Capable to send extra
        power to the internal grid
       Expected payback period:                                                                         Grace El Azar
       3 years                                                                                          Head of HSE
       Project cost: 30 kCHF







                                                                                                                    5
   4   5   6   7   8   9   10   11   12   13   14