Page 9 - Zero is Possible - Volume 2
P. 9
Chekka Logistics Yard
Energy
The sun is in the roof LEBANON
Opportunity Results Cement
The logistics yard currently • Fully operational in
uses electricity generated 2024, producing
only by its own power plant. 11 MWh of renewable
This solar project aims energy in 3 months,
to cut down on energy saving 7 tCO2 and
use from non-renewable 3 tonnes of heavy
sources and reduce the use fuel oil
of fossil fuels.
Solution Jamil Bouharoun
A solar power system, with CEO
a total capacity of 30 kVA,
is made up of 64 solar
panels:
• Installed in the logistics
yard
• Capable to send extra
power to the internal grid
Expected payback period: Grace El Azar
3 years Head of HSE
Project cost: 30 kCHF
5