Page 130 - CRS E-booklet 2022
P. 130
128
Bottom to Top Of LA
9 Replacement of battery chargers of 40Ah rating if 11 00
load current is more than 0.5A, by battery charger
conforming to RDSO spec. No. ru sPc/ Pstl 40-
1s0/cHGR/1210.
10 Replacement of steel anti-creep wire in coastal areas 0 0
with copper catenary wire
11 Implementation of TDMS modules for OHE, PSI, TPC 4 4
and RC 4
Action plan items for the year 2022-23
Sl. Work Bala
No Item in brief Targ Done nce Remarks TDC
. et
Work Under Progress.
Provision of (Buried rail and earth pit welding
earthing station to the rail completed and
at SSP/SP with
1 66 23 43 Provision of Earth pits and 31.03.2023
buried rail as per connection to running rail is
RDSO SMI pending). Details given in
TI/SMI/0032
separate slide.
Reprocess of procurement after
Requirement of approval of PCME is under
Thermo vision
2 16 0 16 progress. (Memorandum of 28.02.23
cameras for each sanction received on
OHE & PSI Depot
20.10.2022)
Replacement of
Failure prone
3 27 20.17 7 Work Under Progress. 30.03.23
Contact wire
(NICCO make )
Enhancement of Work is executing by
Transformer
4 capacity by 10 04 6 Construction and in progress at 31.03.23
DKJ(01),BDCR(02),GNP(02),VKB(
adding the
cooling fans 01).
Provision of
5 RAILNET in all 12 0 12 Managing with dongle --
depots.
Elimination of
Cross track
feeder for the first
track by
connecting LOA issued to M/s Mahalakshmi
6 20 15 5 Enterprises on 08.04.2022, Work 15.01.2023
jumper directly
from gantry/ mast under progress.
using standard
out-rigger
arrangement.