131
11 25KVÄ Interrupters 1384 816 816 100%
12 SPI 173 105 105 100%
25KVÄ Isolators
13 BPI 358 332 332 100%
05 KVA 228 120 120 100%
10 KVA 828 510 510 100%
25KV/230VÄ
14 25 KVA 60 68 68 100%
AOH of ATs
50 KVA 10 6 6 100%
100 KVA 14 14 14 100%
15 ग Gantry 91 74 74 100%
सीर ज रए टर
16 60 33 33 100%
Series Reactor
शंट के पै सटर ब क
17 120 47 47 100%
Shunt Capacitor Banks
b) ENERGY CONSUMPTION VS ENERGY CHARGES:
ANDHRA PRADESH TRANSCO TELANGANA TRANSCO
OPEN ACCESS STATUS:
Electrical Traction Distribution has initiated the process for the Open Access
from power supply utilities through REMCL to get power at a cheaper rate. For
this, Availability Based Tariff meters installation and SCADA (Supervisory
Communication and Data Acquisition) system has been processed with
TRANSCO. Total Rs. 16.86 crores has been paid to TRANSCOs for providing ABT
meters and 1.3 crores has been paid for Data Acquisition System.