                    Capacity enhancement of Traction Power transformers:
                     The traction Power transformers are designed with dual power capacity as
                     21.6  MVA  and  30.24  MVA  (Including  Colling  fans).  Maintaining  the
                     transformer temperature below a critical value by proving the cooling fans
                     enables the transformer to handle a designed enhanced load capacity of
                     30.24  MVA.  The  capacity  of  04  numbers  of  traction  power  transformers
                     GNP-01(TR-83), GT-02(TR-73&74) and SNF-01 (TR-66) has been increased by
                     commissioning the cooling fans.



               .













                             Fig: Power Transformer (TR-83) with cooling fans at GNP Traction sub-station


                    Loop line isolation at LPI Station :
                      LPI  Railway  station  became  busiest  railway  station  in  the  division  and  LPI
                     became the starting/destination station for the most of the express trains in
                     recent days. Getting power block for day to day maintenance of the OHE
                     at  LPI  is  very  difficult  even  during  the  nights  due  to  shunting  and  MMTS
                     movement. Now Division has come up with a solution for getting power by
                     isolating  all  the  individual  lines  at  LPI,  by  erecting  the  4  new  Sectioning
                     insulators and isolators and by converting UIOL to IOL at LPI yard.

                     With  this  modification,  isolation  of  the  individual  lines  becomes  easy  and
                     there  by  getting  power  blocks  for  OHE  maintenance.  Moreover  this
                     modification  increases  the  effective  utilisation  of  manpower  by  reducing
                     the ideal setting of staff due to non-availability of power block.















                                              Fig: Loop line isolation work at LPI


                    Modification of OHE at 163 KM @ PDPL-NZB section:

                       State  government  has  taken  up  the  ROB  work  at  163  KM  (LC-3),  OHE
                       should be made dead for erecting girder and for bridge works at the site.
                       Same was done by creating temporary Section Insulator neutral section
                       by erecting four section insulators and one isolator at Loc. 163/18, 19, 20 &
                       164/1.
   133   134   135   136   137   138   139   140   141   142   143