                          Fig: Rusted cantilever replaced @ loc. 467/6  Fig: Rusted cantilever replaced @ loc. 439/12



                    Provision of new earth pits:

                     Earthing is used to protect the working men from an electric shock. It does
                     this by providing a path through earth electrode for a fault current to flow
                     to earth. It also causes the circuit-breaker to switch off the electric current
                     to  the  faulty  section.  49  nos  (BPA-21  &  BPA-21)  of  new  earth  pits  are
                     provided in KZJ-BPQ section for improving the earthing network during the
                     month.


















                       Fig: new earth pit at BPA station FOB            Fig: New earth pit in BPA Yard.

                Provision of Thimbles:
                    To  avert  the  catenary  strands  cut  inside  the

                    catenary  suspension  clamp  at  the  time  of
                    tripping with high fault currents particularly in
                    monkey  menace  areas,  RDSO  issued  the
                    provision  thimbles  in  each  location.  Total  in      Fig  Thimble in Suspension
                    1296 locations thimbles are being provided.
                                                                             clamp

                Provision of Double cleats:
                   There  are  many  cases  of  Structure  bonds
                   getting  entangled  with  foot  board  of  coach
                   in  recent  times.  To  avert  such  incidents,
                   division  has  come  up  with  the  solution  by
                   providing the Double cleats for the St. bonds
                   on  station  platforms.  Special  Drive  was

                   launched to ensure the all structure bonds at
                   platforms for properly dressing and availability           Fig: Double cleats for bonds on PF
                   of double cleats on vertical wall portion. Total
                   272  new  Cleats  has  been  provided  and  all