Page 144 - CRS E-booklet 2022
P. 144

142


                   other  structure  bonds  were  ensured  in  all
                   station  in  the  division  for  intactness  and  to

                   strive against above said type of failures.


                Provision of Nylon net on portals:
                    As per TI/MI/0050 issued by RDSO to prevent from Bird menace on Traction
                   Installations by provision of Nylon net inside the existing fabricated structures.
                   33 No’s of nylon mesh provided


                Provision of Additional Protection for Bond
                   Sleeves (Double Wall Corrugated Pipes)
                    Heavy  Duty  Piping  for  additional  protection

                    over bond sleeves. Help in reducing the track
                    circuit  failures  and  704  Nos.  of  bonds  are
                    painted with black colour.
                Data of  Manpower and Yard Stick:                              Fig: Additional Protection for Bond Sleeves




                                                                                                Shortage      of
                                         Manpower Sanctioned  Available          Yard      stick
                                TKM                                                             manpower  as
                                         As per RB  Man power  manpower  available
                                                                                                per RB policy


               Non-sub  urban                                                         0.18
               area       (0.22*  3147.53     692          621           554     (Against 0.22)       118
               yard stick/TKM)



               Sub       urban                                                        0.27
               area        (0.45  124.61      56           56            34      (Against 0.45)        22
               yardstick/TKM)



                    Asset failures:


                                                                  2021-22              2022-23
                 Sl.No    Reason           2019-20    2020-21                          (As     on       Total
                                                                           Up     to   31.10.22)
                                                                  Total
                                                                           31.10.22

                 1        CB Trippings         6          0          1           1            0           07

                 2.       Block Burst          7          1          1           1            2           11

                          NICCO
                 3.       contact              3          1          0           0            0            4
                          wire
                          Catenary
                 4.                            1          1          1           1            1            5
                          wire cut
   139   140   141   142   143   144   145   146   147   148   149