Page 145 - CRS E-booklet 2022
P. 145
143
Tree fallen
5. 2 0 0 0 0 2
cases
Insulator
6. 2 1 2 2 0 5
failures
RE/Con.
7. 1 0 0 0 1 2
account
8. Grid Failure 1 0 0 0 2 3
Monkey
9 2 1 0 0 0 3
menace
Tower Car
10. 1 2 1 1 0 5
failure
Miscellaneo
11. 8* 2* 1 1 0 11
us
Total 34 10 07 07 06
Punctuality cases
Sl. 2021-22 2022-23
No Reason (APR-OCT) (APR-OCT)
1 Block burst 1 1
2 NICCO contact wire 0 0
3 Insulator failures 0 0
4 Maintenance 0 0
5 Grid Failure 0 1
6 Miscellaneous 1 0
Total 2 2
ACTION PLAN:
ACTION PLAN FOR BLOCK BURST CASES:
Use of 100% Walkie talkies (License free) for better communication
among working staff.
Visit of site prior to block planning day.
Ensuring the T&P in Good condition.
Use of LED lights (360°) for the night working in tower car.
The contact/catenary wire drums should be checked for smooth
rolling of drum while replacing the wire.