Tree trimming in the 61,141 No’s Tree
4
mainline and siding. were trimmed.
Anti-Bird Discs are
provide for bird
menace in 2500
5 Anti-Bird Disc Location.
Work in progress for
additional 600 Nos.
TDC: 31.12.2022.
Anti-Monkey Work is under
climbing Devices progress for
6 provision of 1200
no.s,
Progress: 905 :
TDC: 30.11.2022.
POWER LINE CROSSINGS DETAILS IN Ballarsha - Kazipet SECTION
Clearance from OHE to
Section
Sl.No Between KM.no/ Type of Voltage bottom of PL Xing
Stations Location conductor
( in meters)
1 BPQ-MAGH UP 138/27-29 33 KV. 5.3
BPQ-MAGH
2 138/28-30 33 KV. 5.3
DN
VHGN-WIRR
3 159/13-15 220 KV 9.6
UP
VHGN-WIRR
4 159/14-16 220 KV 9.8
DN
5 RLT-ASAF 213/7-9 400 KV Double 11.78
6 213/8-10 circuit line 12.15
7 200/5-7 33 KV 3 Phase 5.03
Double circuit
8 200/6-8 line to villages 7.38
VEM-SKZR
9 200/7-9 132 KV 3 Phase 8.02
Single circuit
10 200/8-10 9.67
line to SPM
11 191/19-21 33 KV 3 phase 5.01
SKZR-VEM Single Circuit
12 191/20-22 4.95
line