Monkey Electrocuted
4, 1% 13, 3% 11, 2% Bad Weather (Heavy rain
and thundering)
Bird electrocuted/ Bird
nest fallen
132, 28% 184, 39% Trip shed/ ELS shed/
Panto defect
Tripping with siding CBs
22, 5% Tree branches Fallen
29, 6% 72, 16% Short Circuit Test
Foreign material on OHE/
Loco
The following preventive measures taken to reduce CB trippings:
Sl.N Preventive Measures Action Taken
o.
Replacement of
Bracket/Stay 243 No's Stay
insulators (with
1 composite in stone insulators,
303 No's bracket
pelting) including insulators changed
BHEL make
insulators.
All the sidings
Provision of CB’s for
2 provided with
siding.
separate CBs.
Nylon meshes
provision in portals
3 to reduce the bird 17 Nos. Of Portals
nest forming and for
monkeys.