164


                     Exhibited safety banners and counselled on not to engage with mobile
                      phones while on driving.
                     About  32,000 pamphlets  distributed  among  the  road  users during  the
                      week long safety awareness campaigns at level crossing gates.
                     About  1000  stickers  pasted  on  autos,  trucks,  mini  lorries  and  at  petrol
                      bunks

               d.  STEPS  TAKEN  FOR  SYSTEM  IMPROVEMENTS  AND  TO    BRING  AWARENESS
                    AMONG SAFETY CATEGORY STAFF:

                     Safety drives are being conducted as given in safety calendar and as
                      and  when  ordered  by  HQ/RB,  its  compliance  are  submitted  to  CSO
                      office and no drive’s compliance is pending as on date.
                      Frequent ambush checks/night inspections are being conducted and
                      staff  alertness  being  checked.  Errant  staff  are  being  brought  to  the
                      notice of concerned branch officers.
                     Intensive inspection/audits conducted at major private sidings and the
                      deficiencies  noticed  were  advised  to  siding  authorities  for  immediate

                      attention.
                     The  deficiencies/irregularities  noticed  during  safety  inspections  by
                      safety  branch  are  being  uploaded  in  SIMS  inspection  module  and  its
                      compliance are being monitored by safety branch and  resolving the
                      issues in SIMS.
                     New  initiative  taken-  Daily  one  G&SR  rule  is  being  messaged  to  all
                      safety category staff CUG phone numbers.
                     Monitoring  the  counselling  of  TM  operators  at  specified  intervals  to
                      update their knowledge by CLIs at every crew depot, where these staff

                      is working and as directed by SSE/TM/in charge.
                     HAND BOOK ON SIGNAL LOCATIONS OF ALL SECTIONS WORKED BY SC
                      DIVISION  CREW  INCLUDING  ADJACENT  DIVISIONS  WITH  SPECIAL
                      EMPHASIS ON RHS LOCATIONS ISSUED TO ALL CREW.
                     S&T Cable route marking  indicators provision for easy identification of
                      cables route.
                     Staff  sensitized  to  ensure  Horizontal  clearances  in  station  yard  &
                      Horizontal clearances at other than station yards as per SOD to avoid

                      door hitting cases.
                     Proper isolation at RE area by provision of rod and rope insulation at
                      Non-interlocked LC gates by TrD.
                     Google  forms  created  and  link  shared  to  all  Supervisors  of  Engg,  S&T
                      and TrD branches to fill the forms pertaining to joint inspection of points
                      and crossing, Track circuits and OHE bonds station wise.