Page 161 - CRS E-booklet 2022
P. 161

159


                   5th  wagon  SCR
                   70090260226
                   leading  trolley
                   all        wheels
                   derailed        on
                   right side due to
                   track defect.
              3    On  23.09.20  at  Excess  blast  heaps  Primary:                  Reduction of pay
                   about 15.45 hrs,  at  rail  level  which  Smt. M.                 by one stage for a
                   BOXN        Empty  may  be  the  cause  Puspalatha/G              period of 01
                   rake  with  loco  of derailment.               ang mate           year(NC)
                   No.16579,  while  Casualties:  Nil
                   performing           Cost  of  damages:   Blameworthy:
                   shunting             Nil                       Sri  Subhamoy  Censure
                   movement        by                             Tarafder
                   pushing       from  Committee:  TI/BPA,  /PWI/RDM
                   shunting     neck  SSE/C&W/RDM,
                   to  M-14  line  in  SSE/P       Way/PDPL,
                   RDM                  CLI/RDM
                   marshalling
                   yard,     leading
                   wheel     set    of
                   leading  trolley
                   of  loco  (L6-R6
                   wheel          set)
                   derailed        on
                   curve  location
                   in shunting neck
                   due      to    the
                   excess        blast
                   heaps  at  rail
                   level       which
                   may      be    the
                   cause            of
                   derailment.
              4    On     25.10.2020  Out  of  3  shunting  Primary:
                   at  about  17.37  staff,  Sri  Md  Rafi   K           Madhu,  R/P by one stage
                   hrs,         while  was  in  loco,  Sri  A  SHM/KZJ.              for period of 01
                   pushing the LHB  Suman  was  in  the                              year(NC)
                   coaching             middle       of     the
                   empty         rake  formation  and  Sri  K
                   consisting  of  22  Madhu, SHM was in
                   coaches         for  rear       of       the
                   stabling         at  formation          and
                   washing      line-1  continuously
                   &    2    in   two  instructing    shunter
                   portions,     rear  and      loco    points
                   coach  No.  SC  man  to  back  the
                   LDSLRA  201840  formation  through
   156   157   158   159   160   161   162   163   164   165   166