Page 159 - CRS E-booklet 2022
P. 159
157
approaching Up ensure stopping LP/G/ KZJ Matrix Level-2 (7th
main line starter short of the signal, PC) for a period of
signal(S-3) of PDPL thus caused the Two years where
station failed to SPAD. the period of
control his train Casualties - Nil reduction shall
and passed the Cost of damages - operate to
starter signal at Nil postpone future
“ON” and increments of pay
stopped after Committee: Sr and seniority after
passing at a DME/Co, Sr DSO & restoration”
distance of Sr DSTE.
179.60mts. Reduction to initial
pay Rs.19,900/-
Sri Supriyo pay matrix Level 2
Chatterje,ALP (7th CPC) for a
/RDM period of TWO
(02) years, where
the period of
reduction shall
operate to
postpone future
increments of
pay”
2 On 23.02.2021 at The LP & ALP were Primary: Sri M
09.25 hrs, Tr. No. not alert while Prathap, Compulsory
02592 Exp passed approaching LP/P/SC retirement.
Intermediate routing starter
Starter Signal S-19 signal S19 and Sri Anuj Reduction to initial
at E cabin/ KZJ in passed the said kumar, Sr pay Rs.19,900/- in
Danger aspect signal at “ON’ ALP/SC pay matrix Level-
and stopped after and thus caused 2, for a period of
passing at a the SPAD. three years where
distance of about Casualties - Nil the period of
403 mts. Starter Cost of damages - reduction shall
Signal S-19 was in Nil operate to
danger aspect postpone future
because 02621 Committee: Sr increments of pay
Tamilnadu Exp DME/Co, Sr DSO, & loss of seniority
was given through Sr DSTE & Stn
signals at Bypass Director/SC
line from WL
direction and
passed Bypass
cabin at 09.20 hrs
and section (KMTP
station) cleared at
09.27 hrs