2. YARD ACCIDENTS AND OTHER TRAIN INCIDENTS: 04
Sl Cause, Casualties,
No Brief description Cost of damages &
of accident & Committee Responsibility Status/Penalty
Cause imposed
1 On 05.05.2020 Cause: Primary:
at 12.15 hrs, During forward Sri. Md Umar, Reduction of pay
during shunting movement from M3 shunting by one stage for a
of 8 BCN line towards SC Master /KZJ & period of 06 months
wagons from end Pt No. 24 not (NC)
M3 to M2 line at set in favour of the
KZJ marshalling movement resulted Reduction of pay
yard Pt No.24 trail through the Sri. B.Shanker, by one stage for a
was not set point and while PM/KZJ period of 06 months
properly, during backing on the (NC)
forward same point 6th
movement Pt wagon taken two Secondary: Withholding of
No.24 trail route and 5th Sri B Srinivasa Annual increment
through and wagon from Rao,Sr shunter for one year
while backing engine front trolley /KZJ without cumulative
on the same got derailed. effect.
point 6th Casualties: Nil
wagon from Cost of damages:
loco taken two Nil
routes and 5th Committee:
wagon front TI/KZJ, SSE/Pway/
trolley derailed CR/KZJ,CLI/KZJ,
on point. SSE/S&T/RRI/KZJ &
SSE/C&W/KZJ.
2 On 26.06.2020 Cause: Newly laid Primary: Withholding of one
at about 18.45 track defect P. Chandra set of PTO & One
hrs, while Casualties: Nil Mouli, set of Privilege pass
pushing back Cost of damages: Hammer Man for the one year
the formation of Nil under the
BOBYN rake Committee: control of
from PDPL end AXEN/CON/PDPL, XEN/C/RDM
3rd line (under TI/KZJ,SSE/C7W/KZJ,
construction by CLI/RDM.
RVNL) to Up
loop line of
KOLR station,
4th wagon SCR
70090360186
trailing trolley
two wheels on
left side are in
floating
condition and