waiting hall with 40 Sq m are available. As
per the need/necessity and Railway bard
norms, the facilities like provision of
platforms and other amenities at KZJ town
will be studied and proposed by
Commercial department.
12 Shri. B. Venkatesh Peddapal NIL 8.RUB at LC No. 32 at Tharaka 8.Remarks:
Netha Hon’ble MP li Rama Nagar Village in KOLR – Road Over Bridge was sanctioned in 2017-
( Lok Sabha ) Parliame PTKP Section. 18 on Cost sharing basis at a cost of Rs.72.17
ntary Cr. (Railway share: Rs 28.17 Cr, State share:
Constitu Rs 44.00Cr). General arrangement drawing
ency approved by both Railway and State Govt.
Approach estimate is awaited from State
Govt for framing of combined estimate &
sanction to undertake the work. Reminder
sent on 12.05.22
9.Remarks:
395
9.RUB at LC No. 33 at Box pushing completed. Approach work
Haripuram Village in KOLR – and misc works are in progress. Presently
PTKP Section. progress is stalled by Rains. Work will be
recommenced soon after cessation of rains
and Work is anticipated to be completed by
Feb '23
10.Remarks:
10. RUB at LC No. 35 at Box casting is completed. Approach work
Kothapally Village in PDPL - and misc works are in progress. Presently
KOLR Section. progress is stalled by Rains. Box pushing
work will be started soon after cessation of
rains and Work is anticipated to be
completed by Feb '23.
11 Remark:
11. RUB at LC No. 38 at RUBs sanctioned in Works