Page 402 - GM E-BOOKLET 2022
P. 402

Booking counter on the 2nd platform side will
                                                                                                          be considered as and when the traffic increases.
                                                                                                          Passengers  can  also  avail  the  facility  of
                                                                                                          purchasing  UTS  tickets  to  their  required
                                                                                                          destination  by  downloading  the  UTS-ON-
                                                                                                          MOBILE app on their smart phones.

                                                                    4. Pothkapalli Railway Station        4. Remarks
                                                                    Sheds, Toilets, Drinking Water and    Pothkapalli  is  NSG-6  category  station.  On  an
                                                                    etc
                                                                                                          average 454 passengers per day are dealt at this
                                                                                                          station  with  average  earnings  of  only  Rs.10,
                                                                                                          595/-  per  day.  The  station  is  provided  with  a
                                                                                                          Waiting Hall of 52 sq. meters, 416 sq. meters of
                                                                                                          Shelter,  5  Lavatories,  2  Urinals  and  172  seats
                                                                                                          which  are  more  than  the  prescribed  Railway
                                                                                                          Board  norms  stipulated  for  a  NSG-6  category
                                                                                                          station.
                                                                    5.Flooring   of   Rake    Point   at  5. Remarks
                                                                    Mancherial Railway Station.
                                                                                                          Morram Platform is available at the rake point
                                                                                                          of 2nd Platform at Mancherial station wherein,
      400
                                                                                                          only 6  rakes  are dealt  per  month.  The existing
                                                                                                          facility is considered sufficient for level of rakes
                                                                                                          dealt at present. However, provision of further
                                                                                                          facilities and concrete flooring at the station will
                                                                                                          be planned based on the improvement in goods
                                                                                                          traffic trends.

                                                                    6. Sanction  of  Foot  Over  Bridge  at  6. Remarks
                                                                    Rechini Road Railway Station
                                                                                                          The Foot Over Bridge at Rechni Road Railway
                                                                                                          Station has been sanctioned in 3rd Line Project
                                                                                                          of Kazipet – Balharshah section, and the work is
                                                                                                          expected  to  be  undertaken  shortly  and
                                                                                                          completed in about 12 months.
   397   398   399   400   401   402