Construction of RUB @ L.C 51
1.3.4. RAILWAY AFFECTING TANKS (RATs):
Joint inspections have been carried out by ADENs with State Government
authorities.
Considering the condition of the tanks, if any repairs are to be carried out,
the same are noted and State Govt. authorities have been advised to
carry out the repairs within a targeted date
1.4. SAFETY
Special emphasis has been laid on safety in the division. The following
measures are being taken
1.4.1 SAFETY DRIVES (Upto Oct’ 2022)
No of
S.No Safety drive issued by Frequency Remarks
drives
1 CTE special drive Once in a month 7 Attended
Night surprise foot plate
2 Once in a month 10 Attended
inspection
Safety drive as per Rly
3 15 days drive only 8 Attended
Board order
Special drive on Bridges
includes FOBs / ROBs as
4 per Railway Board letter Quarterly safety 1 Completed
2016/52/CE/III/BR/Safety drive
Dt: 09.07.18.