Page 55 - GM E-BOOKLET 2022
P. 55

REHABILITATION OF Bridge 204

               The other bridge maintenance works carried out are as given below:



                                                                  Proportionate
                                                   Annual                                 Progress
                Sl. No       Description                              target
                                                   Target                              (up to Oct 22)
                                                                  (up to Oct 22)
                  a)           Painting            79413              46324                 59561


                  b)      Oiling & greasing          184                107                  107


               1.3.3. BRIDGE STRENGTHENING WORKS


                       Division is in forefront in strengthening of bridges. Works such as epoxy
                       grouting  done  at  exposed  reinforcement,  de-silting  of  water  ways,
                       provision of flooring to bridges, construction of ballast retainers on the
                       approach  of  bridges  strengthening  of  wing  walls,  replacement  of
                       corroded  re-railing  ramp  plates,  and  replacement  of  corroded  rivet
                       heads and water login got RUBs etc have been done during the year

















                                               REHABILITATION OF Bridge 528





                                                           53