1.2.6 SUMMARY OF LC GATES IN GQ/GD LINES (A Route gates)
As on 11.11.2022
Total
Feasible RUBs
for RUBs and
Sanctions Feasible propose ROBs Balance
No.of LCs to be
manned available for RUBs d in proposi proposed
Section Balance propose PWP 22- ng in
LCs as on d in PWP 23 PWP 22-
1.11.22 Total
22-23 23
ROBs RUBs
KZJ- 46 17 12* 29 17 0 7 7 10+6**=16
BPQ
KZJ-KI 38 13 18 31 7 7 0 7 0
Total 84 30 30 61 27 7 7 14 10+6=16
Note: RUBs and ROBs proposed in PWP 22-23, but not yet sanctioned.
* Out of 12 RUBs. 6 RUBs proposed for deletion, due to drainage problem.
** These 6 LCs to be proposed for ROBs if feasible
1.2.7 SUMMARY OF LC GATES IN KZJ-BPQ SECTION:
Total RUBs
Sanctions and ROBs Qualified
available proposing For
No.of Feasible in ROB/RUB
manned for PWP 22-23 and cost
Section LCs as Total Balance RUB/ROBs sharing Remarks
proposed
on proposal
10.11.22 ROBs RUBs in sent to
PWP21-22
State
Govt,
KZJ- 46 17 12* 29 17 0 7 0 10+6**=1
BPQ 6
Note: * Out of 12 RUBs. 6 RUBs proposed for deletion, due to drainage problem.
**These 6 LCs to be proposed for ROBs if feasible.