1.2.6 SUMMARY OF LC GATES IN GQ/GD LINES   (A Route gates)
                                                                                                                    As on 11.11.2022
                                                                                         Total
                                                                            Feasible     RUBs
                                                                             for RUBs    and
                                   Sanctions                     Feasible   propose      ROBs     Balance
                        No.of                                                                     LCs to be
                      manned       available                     for RUBs      d in     proposi   proposed
            Section                                    Balance   propose     PWP 22-     ng in
                      LCs as on                                  d in PWP      23      PWP 22-
                       1.11.22                  Total
                                                                   22-23                  23

                                 ROBs  RUBs

              KZJ-       46       17     12*     29      17          0          7          7      10+6**=16
              BPQ


             KZJ-KI      38       13      18     31       7          7          0          7           0



             Total       84       30      30     61      27          7          7         14       10+6=16



               Note:  RUBs and ROBs proposed in PWP 22-23, but not yet sanctioned.
                          * Out of 12 RUBs. 6 RUBs proposed for deletion, due to drainage problem.
                         ** These 6 LCs to be proposed for ROBs if feasible

              1.2.7 SUMMARY OF LC GATES IN KZJ-BPQ SECTION:


                                                                              Total RUBs
                                  Sanctions                                   and ROBs    Qualified
                                  available                                   proposing      For
                        No.of                                     Feasible        in       ROB/RUB
                      manned                                         for      PWP 22-23    and cost
             Section   LCs as                  Total  Balance    RUB/ROBs                  sharing      Remarks
                                                                 proposed
                         on                                                                proposal
                      10.11.22   ROBs   RUBs                         in                     sent to
                                                                 PWP21-22
                                                                                            State
                                                                                            Govt,



            KZJ-         46       17     12*    29       17          0            7           0       10+6**=1
            BPQ                                                                                           6


               Note:  * Out of 12 RUBs. 6 RUBs proposed for deletion, due to drainage problem.
                           **These 6 LCs to be proposed for ROBs if feasible.