1.2.4 WORKS CARRIED OUT AT LC GATES TO IMPROVE SAFETY
As on 01.11.2022
Sl.
No Description Manned Planned Completed Remarks
Census has been
1 Census 230 30 30 conducted for all LCs
which are due
2 Up gradation 230 15 - Estimate prepared,
waiting for IRPSM id
3 Improvements to 230 40 - Estimate prepared,
road surfaces waiting for IRPSM id
4 Approach Gradients 230 20 - Estimate prepared,
waiting for IRPSM id
All statutory road
warning boards
5 Retro reflective 230 - - provided with Retro
boards
reflective type boards at
all LCs.
Mechanical boom All non-interlocked LCs
6 locking arrangements 68 - - have been provided
on non-interlocked with boom locking
manned gates. arrangement.
Mechanical sliding All Non-interlocked LCs
7 boom arrangements 68 - - have been provided
on non-interlocked with sliding boom
manned gates. arrangement.
1.2.5 ACTION PLAN FOR ELIMINATION OF MANNED LC’s as on 01.04.2022
Mode of elimination
Interlocked/
Sno Total LCs Total
Non interlocked ROB RUB
1 Interlocked 163 42 30 72
2 Non interlocked 71 0 5 5
Total 234 42 35 77
Note: Recently sanctioned 16 RUBs also included in the above statement.
3 LCs Closed by RUBs in 22-23 & 6 RUBs not feasible for RUB due to drainage issues.
Balance sanctions as on 01.11.2022: 77 - 9= 68 only