Page 51 - GM E-BOOKLET 2022
P. 51

1.2.4 WORKS CARRIED OUT AT LC GATES TO IMPROVE SAFETY


                                                                                       As on 01.11.2022

             Sl.
            No          Description         Manned  Planned  Completed                       Remarks

                                                                                        Census has been
             1             Census              230         30            30          conducted for all LCs
                                                                                         which are due

             2         Up gradation            230         15             -            Estimate prepared,
                                                                                      waiting for IRPSM  id

             3       Improvements to           230         40             -            Estimate prepared,
                       road surfaces                                                  waiting for IRPSM  id

             4     Approach Gradients          230         20             -            Estimate prepared,
                                                                                      waiting for IRPSM  id
                                                                                        All statutory road
                                                                                         warning boards
             5        Retro reflective         230          -             -           provided with Retro
                           boards
                                                                                   reflective type boards at
                                                                                              all LCs.
                    Mechanical boom                                                 All non-interlocked LCs

             6    locking arrangements          68          -             -           have been provided
                    on non-interlocked                                                 with boom locking
                      manned gates.                                                       arrangement.

                    Mechanical sliding                                              All Non-interlocked LCs

             7     boom arrangements            68          -             -           have been provided
                    on non-interlocked                                                  with sliding boom

                      manned gates.                                                       arrangement.


               1.2.5 ACTION PLAN FOR ELIMINATION OF MANNED LC’s as on 01.04.2022


                                                                   Mode of elimination
                                Interlocked/
                         Sno                         Total LCs                                  Total
                                Non interlocked                      ROB           RUB


                           1       Interlocked          163           42            30           72
                           2    Non interlocked          71            0            5             5
                                       Total            234           42            35           77
           Note: Recently sanctioned 16 RUBs also included in the above statement.
                3 LCs Closed by RUBs in 22-23 & 6 RUBs not feasible for RUB due to drainage issues.
                 Balance sanctions as on   01.11.2022: 77 - 9= 68 only