PT PELAYANAN LISTRIK NASIONAL BATAM
                                          DAN ENTITAS ANAK/AND SUBSIDIARY

             CATATAN ATAS LAPORAN KEUANGAN                                      NOTES TO THE CONSOLIDATED
             KONSOLIDASIAN (Lanjutan)                                     FINANCIAL STATEMENTS (Continued)
             Untuk Tahun-tahun yang Berakhir pada                                           For the Years Ended
             Tanggal 31 Desember 2019 dan 2018                                      December 31, 2019 and 2018
             (Dalam Jutaan Rupiah, kecuali dinyatakan lain)          (In Millions of Rupiah, unless otherwise stated)

                 Aset  pajak  tangguhan,  termasuk  yang  timbul     Deferred  tax  assets,  including  those  arising
                 dari rugi fiskal dan perbedaan temporer, diakui    from tax losses carried forward and temporary
                 apabila dianggap lebih mungkin daripada tidak      differences,  are  recognized  only  where  it  is
                 bahwa mereka dapat diterima kembali, dimana        considered more likely than not that they will
                 hal   ini   tergantung   pada   kecukupan          be  recovered,  which  is  dependent  on  the
                 pembentukan laba kena pajak di masa depan.         generation  of  sufficient  future  taxable  profits.
                 Asumsi  atas  pembentukkan  laba  kena  pajak      The  assumptions  about  the  generation  of
                 sangat  dipengaruhi  oleh  estimasi  dan  asumsi   future  taxable  profits  are  heavily  affected  by
                 manajemen atas tingkat penjualan dan biaya-        management’s  estimates  of  the  expected
                 biaya    terkait   yang   terdapat   risiko        sales level and the associated costs which are
                 ketidakpastian,  sehingga  ada  kemungkinan        subject  to  risk  and  uncertainty  and  hence
                 perubahan estimasi dan asumsi tersebut akan        there  is  a  possibility  that  changes  in
                 mengubah  proyeksi  laba  kena  pajak  di  masa    circumstances  will  alter  the  projected  future
                 mendatang.                                         taxable profits.


             5.  Aset Tetap                                    5.   Property, Plant and Equipment

                                                               2019
                                      Saldo awal/                           Increase  Saldo akhir/
                                       Beginning  Penambahan/  Pengurangan/  Reklasifikasi/  arising on  Ending
                                       Balance  Additions  Deductions  Reclassifications  Revaluation  Balance
                                         Rp       Rp       Rp       Rp       Rp       Rp
                 Biaya perolehan                                                                      Acquisition cost
                  Pemilikan  langsung                                                                Direct acquisitions
                   Tanah                 737,405      --       --       --       --    737,405            Land
                   Bangunan dan prasarana  156,691    --       --    295,177     --    451,868  Buildings  and infrastructure
                   Instalasi dan mesin pembangkit  633,019  --  --  1,319,247    --   1,952,266  Installation and power plant
                   Perlengkapan transmisi  1,472,131  --       --    53,693      --   1,525,824  Transmission equipment
                   Perlengkapan distribusi  1,658,152  --      --    80,723      --   1,738,875   Distribution  equipment
                   Perlengkapan telekomunikasi  27,680  --     --     2,625      --     30,305  Telecommunication  equipment
                   Perlengkapan  umum     60,169      --       --     2,795      --     62,964      General equipment
                   Kendaraan  bermotor     195        --       --       --       --      195          Motor vehicles
                   Material cadang utama   6,005      --       --     5,970      --     11,975       Major spare parts
                   Subjumlah             4,751,447    --       --   1,760,230    --   6,511,677          Subtotal
                  Aset sewaan                                                                          Leased assets
                   Bangunan dan prasarana  93,291     --       --    (3,736)     --     89,555  Buildings  and infrastructure
                   Pipa gas              744,453      --       --    (31,598)    --    712,855         Gas pipeline
                   Perlengkapan pengolahan data                                                     Gas pipeline data
                    pipa gas              74,378      --       --    (2,979)     --     71,399    processor  equipment
                   Instalasi dan mesin pembangkit  3,168,344   --     (183)      --   3,168,161  Installation and power plants
                   Subjumlah             4,080,466    --       --    (38,496)    --   4,041,970          Subtotal
                  Pekerjaan dalam pelaksanaan  1,794,716  464,786  (1,760,230)         499,272    Construction in progress
                  Aset tidak digunakan dalam operasi  68,166  --  --    --       --     68,166  Assets not used in operation
                  Jumlah                10,694,795  464,786    --    (38,496)    --   11,121,085           Total
                 Akumulasi penyusutan                                                            Accumulated depreciation
                  Pemilikan  langsung                                                                Direct acquisitions
                   Bangunan dan prasarana    --     8,177      --       --       --     8,177  Buildings  and infrastructures
                   Instalasi dan mesin pembangkit  --  28,103  --       --       --     28,103  Installation and power plant
                   Perlengkapan transmisi    --    40,929      --       --       --     40,929   Transmission equipment
                   Perlengkapan distribusi   --    52,103      --       --       --     52,103    Distribution  equipment
                   Perlengkapan telekomunikasi  --  6,748      --       --       --     6,748  Telecommunication  equipment
                   Perlengkapan  umum     54,000    2,792      --       --       --     56,792      General equipment
                   Kendaraan  bermotor     195        --       --       --       --      195          Motor vehicles
                   Material cadang utama     --      471       --       --       --      471         Major spare parts
                   Subjumlah              54,195   139,323     --       --       --    193,518           Subtotal
                  Aset sewaan                                                                          Leased assets
                   Bangunan dan prasarana  3,732    1,823      --     (181)      --     5,374   Buildings  and infrastructure
                   Pipa gas               37,234   18,181      --    (1,818)     --     53,597         Gas pipeline
                   Perlengkapan pengolahan data                                                     Gas pipeline data
                    pipa gas              14,876    7,266      --     (722)      --     21,420    processor  equipment
                   Instalasi dan mesin pembangkit  1,206,257  129,212  --        --   1,335,469  Installations and power plants
                   Subjumlah             1,262,099  156,482    --    (2,721)     --   1,415,860          Subtotal
                  Aset tidak digunakan dalam operasi  68,013  9  --     --       --     68,022  Assets not used in operation
                  Penyisihan penurunan nilai  1,863   --       --       --       --     1,863     Allowance for impairment
                  Jumlah                 1,386,170  295,814    --    (2,721)     --   1,679,263            Total

                 Jumlah Tercatat         9,308,625                                    9,441,822      Net Carrying Value