Page 369 - GM E-Booklet Dec-2022
P. 369
SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. upto Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost March during upto TDC of Status Phy.
(PB,LB, prog
DRM) '22 2022- date Rly of Rly
2023 portion
60 38 11.03.30.19. 30 2019- LB- HYB Divmn :- Bolarum-Cavalry Barracks - Road over RRSK 0 0 0 0 31/03/ DE under 0 Alternate alignment is under consideration. WIP
1.52.006 2020 182 bridge in lieu of manned level crossing No.250 2024 prep. Alignment-1&2: A lot of land acquisition is involved.
Alignment- 3: RUB can be proposed near to existing
natural drainage available. Sufficient embankment
height and a direct road approach are available.
Feasibility is under study. Span configuration to be
decided. If RUB is not feasible, GHMC is requested to
send a letter to Railways for dropping the work.
61 39 11.03.30.19. 30 2019- LB- HYB Div :- UPW-KMC- Road over bridge in lieu of RRSK 0 0 0 0 31/03/ DE under 0 Joint Inspection to be done. Alignment is in process WIP
prep.
1.52.007 2020 186 manned level crossing No.209/A 2024 of finalization.
62 40 11.03.30.19. 30 2019- LB- HYB Divn :Proposed Elimination of Manned LCs by S.Fund, 404144 17421 42881 60302 31/08/ Det. Est. 10 DHNE: Box launched 107, 209 & 215A, Tender WIP
Sanc.
1.52.008 2020 179 RUBs(10Nos) SC-DHNE 07 LCs viz. RRSK 2024 Awarded for 31, 100 & 150. TDC 31/08/2024.
31,66,100,107,137,147 & 150. SC-MUE 03 LCs viz. MUE Sec: Tender to be Called for 137, 147, 66 & 249.
209, 215A & 249.
63 41 11.03.30.19. 30 2019- - Hyderabad division - SC-DHNE Section :-Elimination RRSK 23652 9286 8 9294 31/03/ Det. Est. 70 Box casting Completed, Box Launching done. TDC WIP
a
n
S
Sanc.
.
c
-
3
0
0
0
2
/
0
0
2
1
3
/
2
1
/
0
0
2
y
b
2
2
0
f
0
2
n
n
M
a
.
5
4.52.001 1 2 2020 0 o of Manned LC No. 116 KM 210/200-300 by 2023 3 3 31/03/2023 3
4
0
0
2
.
1
.
N
o
K
M
1
6
L
C
e
d
Providing RUB in between IKI-MOA Station.
64 42 11.03.30.19. 30 2019- - Hyderabad division - SC-DHNE Section :-Elimination RRSK 24270 2605 0 2605 31/03/ Det. Est. 60 Work Completed. TDC 31/03/2023 PHC
4.52.002 2020 of Manned LC No. 110 @ KM 205/800-900 by 2023 Sanc.
Providing RUB in between PDO-IKI Station.
65 43 11.03.30.19. 30 2019- - Hyderabad Division - Proposed Ancillary Work for RRSK 20236 114 4 118 31/03/ Det. Est. 60 Box casting Completed, Box Launching done. TDC WIP
Sanc.
4.52.003 2020 RUBs in lieu of LC NO. 116 2023 31/03/2023
66 44 11.03.30.19. 30 2019- - Hyderabad division - SC-DHNE Section :-Elimination RRSK 23207 7 12918 12925 30/09/ Det. Est. 0 Boxes casted. Launching to be done. TDC WIP
Sanc.
4.52.004 2020 of Manned LC No. 158 @ KM 284/100-200 by 2023 30/09/2023
Providing RUB in between VDI-BVO Station.