SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. upto Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost March during upto TDC of Status Phy.
(PB,LB, prog
DRM) '22 2022- date Rly of Rly
2023 portion
27 5 11.03.30.16. 30 2016- PB- Mahabubnagar-Manyamkonda- Road over bridge in S.Fund, 0 0 0 0 31/03/ DE under 0 A joint inspection conducted alignment is yet to be WIP
1.52.001 2017 192 lieu of level crossing No. 60 RRSK,E 2023 prep. received. Alignment is located within Town limits
BR(S) and hurdles exist in deciding alignment, to be
finalized by the State government. Work was
transferred to NHAI. During the last review meeting
with R&B, it was informed that this work will be now
taken up by R&B only and they will be submitting the
alignment plan and FORM A. Alignment is yet to be
finalized by State Govt.
28 6 11.03.30.17. 30 2017- PB- Gundlapochampally-Medchal - 4-lane road over S.Fund, 0 0 0 0 31/03/ DE under 0 GAD approved by both Railway and State Govt. WIP
1.52.001 2018 220 bridge in lieu of manned level crossing No.246/A RRSK,E 2024 prep. Combined estimate preparation is pending for
(for 4-lane carriage-way on cost sharing basis) BR(S) nonreceipt of approach estimate from State Govt.
29 7 11.03.30.17. 30 2017- LB- SC-MUE :- Elimination of Manned LC No. 164 RRSK 24604 10185 520 10705 31/03/ Det. Est. 50 Launching of Boxes completed. Approach Works is WIP
3.52.013 2018 204 between SVN and UMRI stations at Km. 388/700- 2023 Sanc. in Progress. TDC 31/03/2023.
800 by constructing RUB.
30 8 11.03.30.18. 30 2018- PB- Timmapur-Shadnagar - Road over bridge in lieu of S.Fund, 0 0 0 0 31/03/ DE under 0 Combined estimate sanctioned. Agency fixed by WIP
e
r
r
W
o
i
l
l
k
w
,
a
i
2
2
0
y
s
a
l
w
D
i
v
t
e
r
e
n
o
o
r
s
i
f
c
o
m
b
e
m
d
a
e
e
n
c
,
s
s
n
i
o
l
r
c
7
2
(
.
g
o
N
0
0
0
2
.
.
1 1.52.001 1 2019 232 level crossing No.27 (PB#304/2018-19/SC) ) RRSK,E E 2024 4 p prep. p . R Railways, Work will be commenced after Diversion of f
2
5
e
l
e
v
2
9
1
3
2
R
C
R
K
S
1
9
-
S
/
8
3
0
#
P
B
4
0
2
1
/
BR(S) Traffic. Traffic diversion permission obtained from
Police and communicated to Rly. for closure of L.C
and shifting of utilities by GHMC is in progress. now
R&B department has requested good bridge work be
kept in the simple curve. Hence discussion is going
on the feasibility of the bridge proper held in the
simple curve.
31 9 11.03.30.18. 30 2018- PB- Falaknuma-Budvel - 4-lane road over bridge in lieu S.Fund, 105232 -5646 0 -5646 31/12/ RE under 0 Combined estimate sanctioned. agency fixed by WIP
1.52.002 2019 234 of level crossing No.7 (PB#304/2018-19/SC) RRSK,E 2024 prep. Railways, Work will be commenced after Diversion of
BR(S) Traffic. Traffic diversion permission obtained from
Police and communicated to Rly. for closure of L.C
and shifting of utilities by GHMC is in progress. The
site is yet to be handed over to Railways to start the
work.due to delay in shifting of pipe line work and
handing over site. Agency is requested to agreement
has pre-closure without liability on either side
approved by competent authority. Henc