Page 360 - GM E-Booklet Dec-2022
P. 360
HYDERABAD DIVISION - 12/12/2022
PLAN HEAD - 1600 (Traffic Facilities)
SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. upto Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost March during upto TDC of Status Phy.
(PB,LB, '22 2022- date Rly prog
DRM) of Rly
2023 portion
1 1 11.03.16.14. 16 2014- LB- Kachiguda - Provision of additional Stabling line DF(3) 9942 1265 401 1666 31/03/ RE under 40 Work Completed TDC 31/03/2023 PHC
prep.
6.52.001 2015 18 2023
2 2 11.03.16.17. 16 2017- PB- Hyderabad Division - New crossing stations (4 Nos) Cap.,E 410861 42610 16792 59402 31/03/ RE under 16 Station Building Construction is in Progress, Bridges WIP
prep.
1.52.001 2018 76 BR(S) 2023 Extension Completed, Formation Completed, P.Way
material Trasportaion under progress. TDC
31/03/2023
3 3 11.03.16.18. 16 2018- LB- Nizamabad- Remodelling of yard arrangements for Cap. 87984 5316 388 5704 31/03/ RE under 10 Work kept under abeyance will be taken up after WIP
3.52.001 2019 10 providing additional platforms and one full length 2023 prep. shifting of Goods Shed to JKM.
dead end spur. Will be Proposed from IRPSM. TDC 31/03/2023
4 4 11.03.16.21. 16 2021- LB-8 Janakampet Jn: Provision of two Additional loop Cap. 107607 0 0 0 31/03/ Det. Est. 0 LOA Issued for Relay Room, TWO Addl Loop Lines on WIP
1.52.001 2022 lines to cater the operational needs. 2023 Sanc. 29/07/2022 and
LOA Issued for Addl. Loop Line to Cater the
Operations on 05/08/2022.
Tender Opened on 05/07/2022 for Br.No. 466.
n
o
.
d
e
i
a
S
t
c
n
t
e
r
b
n
e
T
o
e
d
e
i
a
e
l
D
Detailed Estimate Sanctioned. Tender to be
t
e
d
m
i
t
a
E
t
s
Finalized. TDC 31/03/2023.
5 5 11.03.16.21. 16 2021- LB- Falaknuma - Provision of DN loop line (Standard Cap. 92063 0 48 48 31/03/ Det. Est. 0 PF earth Work is in progress. Work Stopped due to WIP
1.52.002 2022 15 Double line layout. 2023 Sanc. Cable Diversion, Since 10/10/2022. TDC 31/03/2023
6 6 11.03.16.22. 16 2022- - Hyderabad Division: Sitaphalmandi (STPD) - Cap. 23963 0 0 31/03/ Det. Est. 0 Tender opened on 09/12/2022 and Tender Under TUF
6.52.001 2023 Provision of Cross Over point at STPD-A cabin 2024 Sanc. Finalisation
towards KCG end.
7 7 11.03.16.22. 16 2022- - Basar: Provision of Isolation (Sand hump/ RRSK 16328 0 0 31/03/ Det. Est. 0 LOA issued on 30/11/2022 and Work in Progress. WIP
6.52.002 2023 Overshoot line) for 2nd loop towards SC end. 2024 Sanc. TDC 31/03/2024