SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. upto Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost March during upto TDC of Status Phy.
(PB,LB, prog
DRM) '22 2022- date Rly of Rly
2023 portion
18 10 11.03.29.22. 29 2022- - SC-DHNE Sec: Widening of road width, Re- S.Fund 0 0 0 31/03/ DE under 0 Detailed Estimate Under Preparation EST
4.52.001 2023 arranging of Booms & Improvements to Road 2024 prep.
Surface at LC Gates Under ADEN/KCG Section.
19 11 11.03.29.22. 29 2022- - SC-MUE Sec: Widening of road width, Re-arranging S.Fund 0 0 0 31/03/ DE under 0 Detailed Estimate Under Preparation EST
4.52.002 2023 of Booms & Improvements to Road Surface at LC 2024 prep.
Gates Under ADEN/NZB Section.
20 12 11.03.29.22. 29 2022- - Replacement of Mechanical operated Lifting barrier S.Fund 0 0 0 31/03/ DE under 0 Detailed Estimate sanctioned.Schedule under EST
prep.
4.52.003 2023 with Electrical operated lifting barrier at (6 Nos.) 2024 preparation.
interlocked Level crossing gates on STPD-MUE
21 13 11.03.29.22. 29 2022- - Provision of Additional Quad & signalling cable in S.Fund 0 0 0 31/03/ DE under 0 Detailed Estimate sanctioned.Schedule under EST
prep.
4.52.004 2023 for improving communication reliability for Level 2024 preparation.
crossing gates over STPD-DHNE & STPD-MUE
section
22 14 11.03.29.22. 29 2022- - Hyderabad division- SC-DHNE Section-Interlocking S.Fund 0 0 0 31/03/ DE under 0 Work handed over to RVNL for execution. TDC: WIP
t
e
b
w
e
e
n
0
0
/
1
0
0
-
2
2
.
3
0
.
1
3
0
R
2
U
3
2
0
2
L
o
f
g
a
C
2
5
2
4 4.52.005 5 2 2023 3 of LC gate No.19 at Km 37/100-200 between UR- - 2024 4 prep. 31.03.2023. .
.
0
0
.
0
t
a
K
3
7
m
N
t
e
o
9
1
.
TMX stations.