53 31 11.03.30.18. 30 2018- - SC-MUE Section: Fabrication and Supply of RH RRSK 24682 24039 0 24039 31/03/ Det. Est. 95 Girder Fabrication is in progress at workshop WIP
4.52.068 2019 Girders for Emergency Purpose 2023 Sanc. Lallaguda. TDC 31/03/2023
54 32 11.03.30.18. 30 2018- - SC-DHNE Section: Fabrication and Supply of RH RRSK 24682 15212 0 15212 31/03/ Det. Est. 90 Girder Fabrication is in progress at workshop WIP
Sanc.
4.52.073 2019 Girders for Emergency Purpose 2023 Lallaguda. TDC 31/03/2023
55 33 11.03.30.19. 30 2019- LB- Jankampet-Bodhan - Road over bridge in lieu of RRSK 0 0 0 0 31/03/ DE under 0 Joint inspection conducted on 27.08.2020, WIP
prep.
1.52.001 2020 188 manned level crossing No.18/JB 2024 Alignment plan received from State Govton
03.07.2021. GAD has been prepared with a span of
1x48 bow string steel girder(4 lane) and processed
for review of Hyderabad division on 21.07.2022.
State Govt is requesting 4 lanes (2 lanes on Cost-
sharing and 2 lanes with deposit terms)There is no
56 34 11.03.30.19. 30 2019- LB- SC-DHNE Section :- Proposed Road over Bridge as RRSK 0 0 0 0 31/03/ DE under 0 administrative sanction of Telangana State Govt. for
Alignment finalized by State Government. Alignment WIP
1.52.002 2020 159 1x46.00M in lieu of LC No.90A with clear span 2024 prep. plan received on 29.07.2021. GAD under Preparation.
composite steel girder at Km 166/500-600.
57 35 11.03.30.19. 30 2019- LB- SC-MUE Section :- Proposed construction of Road RRSK 0 0 0 0 31/03/ DE under 0 Joint inspection completed. Alignment and GAD are WIP
l
a
n
i
i
z
a
t
o
i
f
e
t
2
2
0
r
e
n
d
n
t
t
e
i
u
b
m
d
t
h
e
b
y
o
r
m
F
.
-
s
s
a
A
w
g
d
e
B
i
r
4
x
.
6
s
a
1
r
0
.
0
0
.
1 1.52.003 3 2 2020 162 over Bridge as 1x46.00M clear span composite 2024 4 prep. u under finalization. Form-A was submitted by the
2
5
o
2
e
v
0
2
6
1
a
n
p
r
s
o
s
i
p
c
o
m
l
c
a
e
0
0
M
steel girder at Km 607/0-100 in lieu of LC No.228 state Govt. and Form- B was submitted to State
Govt. by Railways.
58 36 11.03.30.19. 30 2019- LB- Jankampet-Bodhan - Road over bridge in lieu of RRSK 0 0 0 0 31/03/ DE under 0 A joint inspection was conducted on 27.08.2020. WIP
prep.
1.52.004 2020 187 manned level crossing No.12/JB 2024 Alignment plan received from State Govt. on
17.07.2021. GAD has been prepared with a span of
1x72 bow string steel girder(4 lane) and processed
for review of Hyderabad division on 21.07.2022.
State Govt is requesting 4 lanes (2 lanes on Cost-
sharing and 2 lanes with deposit terms) There is no
administrative sanction of Telangana State Govt. for
construction of this ROB.
59 37 11.03.30.19. 30 2019- LB- SC-MUE Section :-Construction of Road over Bridge RRSK 0 0 0 0 31/03/ DE under Alignment finalized in Jan'21, Form-A received. GAD WIP
1.52.005 2020 164 as 1x72.00M clear span Bow string steel girder at 2023 prep. under preparation, field survey was done. Rly. portion
Km 1/700-800 in lieu of LC NO.2/MLY GAD under preparation. Now work has transferred to