PLAN HEAD - 3000 (RUBs/ROBs)
SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost upto during upto TDC of Status Phy.
(PB,LB March 2022- date Rly prog
,DRM) of Rly
'22 2023 portion
4 1 11.03.30. 30 2001-PB- Safilguda - Road under bridge in lieu of level S.Fund, 68376 0 0 0 31/03/ RE 0 Due to the non-availability of land for approaches ( WIP
01.1.52.0 2002 121 crossing No 254 RRSK,E 2024 under Defence land ), GHMC is not able to plan even 2
02 BR(S) prep. lanes Due to the non-availbilty of land for approaches
( Defence land ), GHMC is not able to plan even 2
lane RUB at safilguda. GHMC officials had informed
that they are pursuing with Defence Authorities to
acquire land for the approach road .In the last
meeting on 04.5.2020 with Hon'ble Minister of Urban
Development it was communicated that the State
Govt.will resolve the land issues with Defenc
5 2 11.03.30. 30 2012-PB- Dichpalli-Nizamabad - 2-lane road over bridge S.Fund, 320458 0 1308 1308 31/12/ Det. 0 Modified detailed estimate with revised cost sharing WIP
12.1.52.0 2013 145 & limited use subway in lieu of level crossing RRSK,E 2022 Est. pattern for 4 lane road traffic (due to increased TVUs
01 No.193 BR(S) Sanc. as per latest census), amounting to Rs. 93.12 Crores
s
e
r
+
S
t
a
.
0
C
0
r
o
5
3
a
r
S
h
e
R
s
:
G
t
e
o
.
v
t
S
h
y
( (Rly Share: Rs.30.05 Crores + State Govt. Share: Rs. .
R
l
a
R
s
.
r
e
:
6 3 . 0 7 C r o r e s ) s e n t t o R a i l w a y B o a r d v i d e l e t t e r n o .
63.07 Crores) sent to Railway Board vide letter no.
W.CON.352/Y/530 dated 03.09.2020. CE/R&B
accorded consent for cost sharing. C.Estimate
sanctioned on 21.10.20, Combined estimate
sanctioned.Tender Rly. portion Tender opend and
under finalisition. Approaches work: Telangana State
Govt
6 3 11.03.30. 30 2016-PB- Mahabubnagar-Manyamkonda- Road over S.Fund, 0 0 0 0 31/03/ DE 0 A joint inspection conducted alignment is yet to be WIP
16.1.52.0 2017 192 bridge in lieu of level crossing No. 60 RRSK,E 2023 under received. Alignment is located within Town limits and
01 BR(S) prep. hurdles exist in deciding alignment, to be finalized by
the State government. Work was transferred to NHAI.
During the last review meeting with R&B, it was
informed that this work will be now taken up by R&B
only and they will be submitting the alignment plan
and FORM A. Alignment is yet to be finalized by State
Govt.
7 4 11.03.30. 30 2017-PB- Gundlapochampally-Medchal - 4-lane road over S.Fund, 0 0 0 0 31/03/ DE 0 GAD approved by both Railway and State Govt. WIP
17.1.52.0 2018 220 bridge in lieu of manned level crossing RRSK,E 2024 under Combined estimate preparation is pending for
01 No.246/A (for 4-lane carriage-way on cost BR(S) prep. nonreceipt of approach estimate from State Govt.
sharing basis)