SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost upto during upto TDC of Status Phy.
(PB,LB prog
,DRM) March 2022- date Rly of Rly
'22 2023 portion
8 5 11.03.30. 30 2018-PB- Timmapur-Shadnagar - Road over bridge in lieu S.Fund, 0 0 0 0 31/03/ DE 0 Combined estimate sanctioned. Agency fixed by WIP
18.1.52.0 2019 232 of level crossing No.27 (PB#304/2018-19/SC) RRSK,E 2024 under Railways, Work will be commenced after Diversion of
01 BR(S) prep. Traffic. Traffic diversion permission obtained from
Police and communicated to Rly. for closure of L.C
and shifting of utilities by GHMC is in progress. now
R&B department has requested good bridge work be
kept in the simple curve. Hence discussion is going
on the feasibility of the bridge proper held in the
simple curve.
9 6 11.03.30. 30 2018-PB- Falaknuma-Budvel - 4-lane road over bridge in S.Fund, 105232 -5646 0 -5646 31/12/ RE 0 Combined estimate sanctioned. agency fixed by WIP
18.1.52.0 2019 234 lieu of level crossing No.7 (PB#304/2018- RRSK,E 2024 under Railways, Work will be commenced after Diversion of
02 19/SC) BR(S) prep. Traffic. Traffic diversion permission obtained from
Police and communicated to Rly. for closure of L.C
and shifting of utilities by GHMC is in progress. The
site is yet to be handed over to Railways to start the
g
i
n
p
o
f
t
n
i
i
f
s
h
n
a
w
d
r
o
k
e
i
p
n
e
l
i
y
.
k
u
d
w
work.due to delay in shifting of pipe line work and
r
o
e
e
d
a
l
t
o
handing over site. Agency is requested to agreement
has pre-closure without liability on either side
approved by competent authority. Henc
10 7 11.03.30. 30 2019-LB- Jankampet-Bodhan - Road over bridge in lieu RRSK 0 0 0 0 31/03/ DE 0 Joint inspection conducted on 27.08.2020, WIP
19.1.52.0 2020 188 of manned level crossing No.18/JB 2024 under Alignment plan received from State Govton
01 prep. 03.07.2021. GAD has been prepared with a span of
1x48 bow string steel girder(4 lane) and processed
for review of Hyderabad division on 21.07.2022.
State Govt is requesting 4 lanes (2 lanes on Cost-
sharing and 2 lanes with deposit terms)There is no
administrative sanction of Telangana State Govt. for
construction of this ROB.
11 8 11.03.30. 30 2019-LB- SC-DHNE Section :- Proposed Road over Bridge RRSK 0 0 0 0 31/03/ DE 0 Alignment finalized by State Government. Alignment WIP
19.1.52.0 2020 159 as 1x46.00M in lieu of LC No.90A with clear 2024 under plan received on 29.07.2021. GAD under Preparation.
02 span composite steel girder at Km 166/500- prep.
600.