Page 396 - GM E-Booklet Dec-2022
P. 396
HYDERABAD DIVISION - GATI SHAKTI WORKS - 12/12/2022
PLAN HEAD - 1600 (Traffic Facilities)
SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost upto during upto TDC of Status Phy.
(PB,LB prog
,DRM) March 2022- date Rly of Rly
'22 2023 portion
1 1 11.03.16. 16 2018-LB- Nizamabad- Remodelling of yard arrangements Cap. 87984 5316 388 5704 31/03/ RE 10 Work kept under abeyance will be taken up after WIP
18.3.52.0 2019 10 for providing additional platforms and one full 2023 under shifting of Goods Shed to JKM.
01 length dead end spur. prep. Will be Proposed from IRPSM. TDC 31/03/2023
2 2 11.03.16. 16 2021-LB-8 Janakampet Jn: Provision of two Additional Cap. 107607 0 0 0 31/03/ Det. 0 LOA Issued for Relay Room, TWO Addl Loop Lines on WIP
21.1.52.0 2022 loop lines to cater the operational needs. 2023 Est. 29/07/2022 and
01 Sanc. LOA Issued for Addl. Loop Line to Cater the
Operations on 05/08/2022.
Tender Opened on 05/07/2022 for Br.No. 466.
Detailed Estimate Sanctioned. Tender to be
Finalized. TDC 31/03/2023.
3 3 11.03.16. 16 2021-LB- Falaknuma - Provision of DN loop line Cap. 92063 0 48 48 31/03/ Det. 0 PF earth Work is in progress. Work Stopped due to WIP
21.1.52.0 2022 15 (Standard Double line layout. 2023 Est. Cable Diversion, Since 10/10/2022. TDC 31/03/2023
c
02 2 Sanc. .
0
S
n
a