Page 400 - GM E-Booklet Dec-2022
P. 400
PLAN HEAD - 4200 ( WORKSHOPS )
SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost upto during upto TDC of Status Phy.
(PB,L March 2022- date Rly prog
B,DR '22 2023 portion of
M)
17 1 11.03.42. 42 2019-LB- Integrated Bogie Assembly and Dis-assembly Cap. 153984 0 0 0 31/03/ Det. Rly As advised by COFMOW, revised specification, flow WIP
0
19.1.52.0 2020 710 for LGD shops 2023 Est. charts and essentiality submitted to COFMOW for
01 Sanc. further process.
- Draft specifications received from COFMOW has
resubmitted duly incorporating required corrections.
Tender floated on 04.05.2022. At present, Tender is
under technical evaluation.