SIGNALLING & TELECOMMUNICATION
SIGNALLING
1. New S&T service buildings constructed at 09 mid-section interlocked LC gates.
(133, 236A, 178, 190A,166, 232,1JB, 211 & 191) and provided mini IPS systems
along with battery banks and solar panels. In overall, 26 midsection LC gates have
been provided with IPS out of total 39 mid-section interlocked LC gate in the
divisions. Removed old location boxes at these gates and shifted relay wiring to new
service building.
2. Carried out linking of data logger with Control Office Application (COA) for
reporting train arrival/departure timings at Kurnool City station on 26.09.2019,
Nizamabad station on 29.09.2019 and Dharmabad station on 05.11.2019
55