Page 64 - GM booklet 2019 test
P. 64

SIGNALLING & TELECOMMUNICATION


                                                     SIGNALLING


               1.  New S&T service buildings constructed at 09 mid-section interlocked LC gates.
                   (133,  236A,  178,  190A,166,  232,1JB,  211  &  191)  and  provided    mini  IPS  systems
                   along with battery banks and solar panels. In overall, 26 midsection LC gates have
                   been  provided  with  IPS  out  of  total  39  mid-section  interlocked  LC  gate  in  the
                   divisions. Removed old location boxes  at  these gates and shifted relay wiring to new
                   service  building.




































               2.  Carried  out  linking  of  data  logger  with  Control  Office  Application  (COA)  for
                   reporting  train  arrival/departure  timings  at  Kurnool  City  station  on  26.09.2019,
                   Nizamabad station on 29.09.2019 and Dharmabad station on 05.11.2019

























                                                            55
   59   60   61   62   63   64   65   66   67   68   69