6. Passenger Train No. 57448 in DN direction and Train No. 57602 in UP direction are
run with Electric Loco on 20/21.09.2019 in KCG – MED section and no safety related
issues were found and no infringements.
7. New SCADA system [Latest spec. 0130, Rev.2] commissioned in TPC/HYB.
New RTU commissioned at SC/SSP, KCG/SSP, SFX/SP, BMO/SSP & MED/SSP by
M/s. Synergy Systems and Solutions Pvt. Ltd, Faridabad.
“Special Drives” attended by Division :
All Special drives has been conducted to improve reliability by Stagger Checking &
Jumper checking/Adjustment etc., done in sections SC – FM, SC – MJF - MLY‟C &
MJF – BMO as per SED as per HQ instructions.
Special Works carried out in HYB division:
1. Staff were deputed for RVNL works at BMO, FM for Loading and Un-loading of masts
and Erection of masts and DA‟s at FM - BDVL section.
2. Model OHE was commissioned at KCG Depot.