Page 1 - Signal&Telecomunication
P. 1

SIGNALLING & TELECOMMUNICATION


                                                       SIGNALLING


               1.  Interlocking of Manned LC: Carried out interlocking of existing engineering manned
                   LC gate no 189A(A class, Km 46/750-800) between NVT-JKM section on 18.02.2021.
                   Provided mini IPS in new service building, Solar panels,  Electrically operated lifting
                   barrier  of  S&T  Workshop/MFT,  Emergency  sliding  boom  and  Approach  warning
                   arrangement.














                                  Provision of mini IPS in new service building at Interlocked LC no. 189A

               2.   New  S&T  service  buildings  constructed  at  11  mid-section  interlocked  LC
                    gates.(234A,10JB,7JB,5JB,17JB,219,217,187,193,185&  189A)  and  provided    Mini
                    IPS systems along with battery banks and solar panels. In overall, 36 midsection
                    LC gates  have  been  provided  with  IPS  out  of  total  38  mid-section  interlocked  LC
                    gate in the division. Removed old location  boxes  at  these gates and shifted relay
                    wiring to new  service  building.

                    Bifurcation  of  Power  supply  in  Automatic  territory  STPD`A'-KCG,  KCG-FM  (2
                    locations), MJF –CVB and  BMO-CVB section carried out for non-blanking of Signals
                    by providing separate AT and IPSwith battery bank innew service building and
                    commissioned.












                                                     AT and IPSwith battery bank innew service building


               3.   Existing 08 Mechanically Operated Lifting barrier (MOLB)at interlocked LC gates
                    replaced  with  Electrically  Operated  Lifting  barrier  (EOLB)  at  LC 68, LC.2/MLY,
                    LC27, LC28, LC47, LC145, LC155 & LC 189A In overall 25 LC gates out of total
                    interlocked 78 LC gates have  been completed.