i)  Major IPS for outdoor circuits and Mini IPS for EI system have been provided.


















                                                                      Mini IPS for outdoor circuits

                       j)  Total 127  signal apsects  have  been provided  with  integrated  type  LEDs  at
                          SHNR, BABR, GLY, LC33& 39.











                                                                              Integrated LEDs

               6.  Circuit  alteration  carried  out  for  provision  of  overlap  point  release  at  KCG  station
                   with time release of  60secs and at TMX, JCL, UKD, MZL,VDI,TMD & CVB stations
                   with time release of 120secs.















                                                                               Circuit alterations at KCG.

               7.  Approach  Warning  System  for  both  Up  and  Dn  directions  in  07  mid-section
                   interlocked LC gates provided at LC 17JB, LC 164, LC 58, LC10, LC 60A, LC 61&
                   LC 189A. All 38 mid-sections interlocked LC gates have been completed.














                                                        Approach warning systems at mid section LCs.