i) Major IPS for outdoor circuits and Mini IPS for EI system have been provided.
Mini IPS for outdoor circuits
j) Total 127 signal apsects have been provided with integrated type LEDs at
SHNR, BABR, GLY, LC33& 39.
Integrated LEDs
6. Circuit alteration carried out for provision of overlap point release at KCG station
with time release of 60secs and at TMX, JCL, UKD, MZL,VDI,TMD & CVB stations
with time release of 120secs.
Circuit alterations at KCG.
7. Approach Warning System for both Up and Dn directions in 07 mid-section
interlocked LC gates provided at LC 17JB, LC 164, LC 58, LC10, LC 60A, LC 61&
LC 189A. All 38 mid-sections interlocked LC gates have been completed.
Approach warning systems at mid section LCs.