Page 5 - Signal&Telecomunication
P. 5
8. 46 nos of Starter indicators provided for 32 running lines where starters are not
visible to Guards at 19 stations.
Provision of starter indicators at 19 stations.
9. In view of ROB/RUB works, existing 07 interlocked gates LC No.99/T, LC No.14, LC
No.15, LC No.232, LC No.224, LC No.245 & LC No.213/T closed.
10. Carried out signaling alterations in relay room and replaced operating panel in
connection with proposed Satellite Track Machine Depot at Cavalry barracks and
commissioned on 12.02.2021.
11. Provided 292 Chokes in Relay ends at 07 stations & 05 Auto sections.
12. Carried out linking of datalogger with Control office application (COA) for reporting
train arrival/departure timings at Mahbubnagar&Medchal stations.
13. Existing single line pushbutton tokenless block instrument between BVO-DHNE
section replaced with UFSBI along with HASSDAC of CEL make working on dual
media(OFC & Quad cable).
52