10.  On     19.08.2020,     M/s     Surya     Electronics     make      IPIS    (Specn     No.
                   RDSO/SPN/TC/61/2015 (Rev-4.0) Amdt.1) has been commissioned at SHNR station
                   with 25 nos. of Coach Indication Boards on PF No.1, 22 Nos of CIBs on PF No.2,
                   02 Nos. of SLDB-one each on PF No. 1 & 2, 01 No. of DLSB on concourse &01 No.
                   of AGDB.


















                       .
                                                          CIBs at SHNR

               11.  On  14.09.2020,  02  No.of  Double  line  Single  Faced  (DLSB)  Train  Indication
                    Boards  (one  per  station)  of  M/s  Surya  Electronics  have  been  installed  &
                   commissioned  at  concourse  of  BABR  &  GLY  Stations  by  M/s  Surya  Electronics,
                   through RVNL.













                                                       TIBs at BABR station

               12.  CCTV,  Telephone  Connections  (Railway,  FCT  &  BSNL)  &  Wi-Fi  facilities  were
                    provided in COVID-19 Isolation wards at Central Railway Hospital/LGD.

               13. 35 Nos. of CCTV IP Cameras (15 Nos. of Dome & 20 Nos. of Bullet Cameras) have
                   been installed in Rail Nilayam Building and premises with 64 Channel NVR and one
                   No. of 55” Display installed at Zonal Security Control Room.

               14. 44 BSNL Landline connections of Offices / Residence of Officers over Hyderabad
                   Division have been surrendered, savings of Rs.10,000/- (approx.) per month.

               15. NTES  Integration  of  IPIS  System  on  Railnet  has  been  done  at  VAR,  FM,  SHNR,
                   BABR, JCL, GLY, GWD, MBNR, KRNT, MJF, BMO,MED, KMC, NZB, DAB & UMRI
                   stations.